States we serve
Massachusetts Insulation Contractor Insurance
The Massachusetts Construction Supervisor License has a “Specialty CSL insulation”, and the Home Improvement Contractor registration under M.G.L. c. 142A reaches residential contracting on pre-existing owner-occupied homes in the unit range the statute sets. Under M.G.L. c. 152, § 25A every employer must provide for workers’ compensation through an insurer, a self-insurance group or a self-insurer license.
The Massachusetts Construction Supervisor License has a specialty category named insulation, for the building types the state’s license page lists, and the Home Improvement Contractor registration under M.G.L. c. 142A reaches residential contracting on pre-existing owner-occupied homes in the unit range the statute sets. Under M.G.L. c. 152, § 25A every employer must provide for the payment of compensation through an insurer or a self-insurance group, or by a license as a self-insurer, and the Department of Industrial Accidents says “The requirement applies no matter the number of hours worked or the number of employees”, with an exception for domestic employees that the department states. What follows takes each rule from the office that states it: the license and the registration, workers’ compensation, the energy code, federal OSHA and the city permit offices.
The Specialty CSL insulation and the Board of Building Regulations and Standards
The state’s page on the types of Construction Supervisor License, offered by the Division of Occupational Licensure, the Office of Public Safety and Inspections and the Board of Building Regulations and Standards, lists a “Specialty CSL insulation” whose scope of work is “Installation of insulation including repair and replacement of sheathing and siding”. For the insulation specialty, the same page prints “Building Types and Structures: Buildings of any use containing less than 35,000 cubic feet 1- and 2-family dwellings with any additional accessory Buildings or structures for agricultural use”. The board’s own page says “The Board of Building Regulations and Standards (BBRS) monitors Massachusetts building codes and construction supervisor licensing.”
The state building code’s rule on licensing construction supervisors says a licensed construction supervisor or licensed designee “shall be present on the site at some point to approve construction, reconstruction, alterations, removal or demolition involving the following work”, and the list includes “Energy conservation: Installation of insulation materials, vapor and air infiltration barriers.” The board’s dwelling permit form asks for the construction supervisor’s license type and lists “I Insulation” among the types.
The licensing rule carries a homeowner provision: “Any homeowner performing work for which a building permit is required shall be exempt from the licensing provisions of 780 CMR 110.R5, provided that if a homeowner engages a person(s) for hire to do such work, then such homeowner shall act as supervisor.” The state’s page on when a Construction Supervisor License is required says “Massachusetts does not recognize out of state contractor licenses.”
Home Improvement Contractor registration under M.G.L. c. 142A and the consumer-affairs office’s guidance chart
M.G.L. c. 142A, § 9(a) says “No contractor or subcontractor shall undertake, offer to undertake, or agree to perform residential contracting services unless registered therefor with the approval of the office of consumer affairs and business regulation.” Section 1 defines residential contracting by work on “any pre-existing owner occupied building containing at least one but not more than four dwelling units”, used or designed as a residence, or on structures adjacent to it.
For insulation work by name, the source is the Office of Consumer Affairs and Business Regulation’s HIC Contractor Resources page, in a chart it calls “for general guidance only”. In that chart, the office marks insulation work yes for a CSL, an HIC registration and a building permit, with the comment “Insulation CSL minimum.” The office says “An HIC Registration is different from a Construction Supervisor License (CSL) and they are not interchangeable.”
Under M.G.L. c. 142A, § 2(a), an agreement to perform residential contracting services above the amount the section sets “shall be in writing”, and its required contents include “a detailed description of the work to be done and the materials to be used in the performance of said contract”. The state’s dwelling permit application notes that “An Owner who obtains a building permit to do his/her own work, or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor (HIC) Program), will not have access to the arbitration program or guaranty fund under M.G.L. c. 142A.”
The § 25A self-insurance group route and the Department of Industrial Accidents’ word on LLC members
M.G.L. c. 152, § 25A says “every employer shall provide for the payment to his employees of the compensation provided for by this chapter”, either “By insurance with an insurer or by membership in a workers’ compensation self-insurance group” or, subject to the department’s rules, “by obtaining from the department annually a license as a self-insurer”. The Department of Industrial Accidents says “All employers operating in Massachusetts are required to carry workers’ compensation insurance for their employees and themselves if they are an employee of their company. The requirement applies no matter the number of hours worked or the number of employees. The only exception is for domestic employees who must work at least 16 hours a week to be covered under a workers’ compensation policy.”
The DIA’s page on getting coverage says “The Department of Industrial Accident DOES NOT set insurance rates or issue workers’ compensation policies.” For an employer turned down by insurers, the DIA points to the state’s workers’ compensation rating bureau, which it says “oversees the workers’ compensation assigned risk pool.” The DIA also says “Members of a limited liability company (LLC), partners of a limited liability partnership (LLP), or sole proprietors of an unincorporated business aren’t required to carry workers’ compensation insurance for themselves”, and “This exemption does not apply to employees who are not members of the LLC or LLP. They must still be covered.”
Section 25C(6) at the permit desk, the DIA affidavit and the stop work order
M.G.L. c. 152, § 25C(6) says “Every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required by this chapter.” The building code repeats the rule: among the requirements that, “where applicable, shall be satisfied before a permit is issued”, its administration chapter lists “Workers Compensation Insurance: in accordance with M.G.L. c. 152, § 25C(6).”
The DIA’s affidavit for builders and contractors asks an employer to “Attach a copy of the workers’ compensation policy declaration page (showing the policy number and expiration date).” On the same affidavit, a general contractor using subcontractors must attach a list of them, and “If the sub-contractors have employees, they must provide their workers’ comp. policy number.”
The affidavit warns that failing to secure coverage under section 25A “can lead to the imposition of criminal penalties” as well as civil penalties “in the form of a STOP WORK ORDER”. Under § 25C(1), when the commissioner finds an employer without required coverage, “a stop work order shall be served on said employer, requiring the cessation of all business operations at the place of employment or job site.”
The DIA’s requirements page reminds employers: “Please be advised that workers’ compensation and liability insurance ARE NOT the same thing.” Boston’s Short-Form Permit page lists a “Certificate of Liability Insurance (must be current)” and the “MA State Worker’s Compensation Affidavit” as separate uploads; the lines behind them are general liability and workers’ compensation.
The tenth edition’s base energy code and DOER’s opt-in Stretch and Specialized codes
The Board of Building Regulations and Standards’ tenth-edition page says “The tenth edition building code became first effective on October 11, 2024 with a concurrency period, during which either the ninth or tenth edition building codes could be utilized. This concurrency period, which was thereafter extended, ends June 30, 2025, at which time the tenth edition will be the only building code in effect.” The Massachusetts Department of Energy Resources says “The Base Code is IECC 2021 with MA amendments: 780 CMR Chapter 11R (residential) and 780 CMR Chapter 13 (commercial).”
For a house, the residential energy chapter, 780 CMR 51.00 Chapter R11, names the 2021 International Energy Conservation Code (IECC) with Massachusetts Amendments and sets an exception: “Where a municipality has adopted the Stretch energy code or Specialized opt-in energy code then 225 CMR 22.00 shall apply.” For commercial buildings, the state building code’s energy chapter lists the compliance sections a commercial building may follow, among them section C401.2.2, which says “C401.2.2 ASHRAE 90.1. Commercial buildings shall comply with the requirements of ANSI/ASHRAE/IESNA 90.1 as modified by C402.1.5, C402.3, C405.3, C405.4, C405.13 and C406.”
DOER says “The opt-in Stretch Code is IECC 2021 with key MA amendments: 225 CMR Chapter 22 (residential) and 225 CMR Chapter 23 (commercial).” It says “Municipalities may choose to adopt the Stretch Code in lieu of the Base Energy Code.” It also says “The opt-in Specialized Code is IECC 2021 key MA amendments: 225 CMR Chapter 22 + Appendix RC (residential) and 225 CMR Chapter 23 + Appendix CC (commercial).” The Board’s tenth-edition page adds “Note that with regards to energy, the 10th edition is considered a “base” energy code. The Massachusetts Department of Energy Resources (DOER) adopts stretch and specialized stretch codes (see 225 CMR 22.00 and 23.00), please consult your municipality to determine if one of these codes apply.”
Grade I installation, R-values on construction documents and envelope insulation inspections
The Massachusetts amendment to the residential table titled “AIR BARRIER AND INSULATION INSTALLATION” says “All insulation shall be installed at Grade I quality in accordance with ICC/RESNET 301.” and “Air-permeable insulation shall not be used as a sealing material.” Where this chapter applies, its words are “All insulation”, so they speak to a fiberglass batt or blown-insulation crew and a spray foam crew alike.
Under Section R103.2 of the same chapter, construction documents must show, as applicable, details that include “Insulation materials and their R-values.” For the commercial energy chapter, the state building code’s administration chapter says “Inspections shall be made to determine compliance with 780 CMR13.00: Energy Efficiency and shall include, but not be limited to, inspections for: envelope insulation R and U values, fenestration U values, duct system insulation R values”.
Who OSHA’s Massachusetts State Plan leaves to federal OSHA, and EPA’s word on attic vermiculite
OSHA’s State Plans page lists Massachusetts among the State Plans “that cover state and local government workers only”, and OSHA’s Massachusetts State Plan page says “OSHA also exercises authority over private sector employers in the state and federal OSHA standards apply to these workers.”
For spray polyurethane foam work, the U.S. Environmental Protection Agency’s contractor-client checklist says it “was prepared as a voluntary aid to protect against potential risks from SPF; it is not a regulatory compliance tool”, while “some of the best practices included in the checklist may be required under local, state or federal worker protection or other regulations.” For attics with vermiculite, EPA advises: “Hire a professional asbestos contractor if you plan to remodel or conduct renovations that would disturb the vermiculite in your attic or walls to make sure the material is safely handled and/or removed.”
Inspectional Services in Boston, Cambridge and Somerville, and the permit papers of Worcester, Lowell and Springfield
Each card quotes the city office or city form it names, and says nothing that office does not state.
Boston
Boston’s Inspectional Services Department tells a contractor applying for a Short-Form Permit to upload a “Front and back copy of your valid, non-expired trade license”, a “Certificate of Liability Insurance (must be current)” and the “MA State Worker’s Compensation Affidavit”. Its Change of Licensed Builder page says “Massachusetts law requires a licensed builder to be actively in charge at all times. All work must stop if the original license holder departs and a replacement has not been approved.”
Worcester
Worcester’s Department of Inspectional Services says “Your tradesperson license, along with a copy of your Workers Compensation Insurance documentation must be on file with the Department of Inspectional Services and/or attached to a submitted application for a permit.”
Cambridge
Cambridge’s Inspectional Services Department says “Building permits are issued to construction supervisors licensed by the City of Cambridge or the State of Massachusetts.” It adds “The State license is only valid for work involving structures of less than 35,000 cu. Ft.”
Lowell
Lowell’s residential building permit application asks for the licensed construction supervisor and the registered home improvement contractor, and says “In accordance with MGL c152s25C(6) a Workers Compensation Affidavit must be completed and submitted with this application.”
Somerville
Somerville’s Building Division says “If you are a licensed contractor, submit your CSL (construction supervisors license) and, if the property is 1-4 units and owner occupied, submit your HIC (home improvement contractor registration).” It adds “You will also need to submit your insurance, signed contract, plans if the work you are doing requires them, Workplace Safety Affidavit, Wage Theft Affidavit, Site Safety Plan, and OSHA certification.”
Springfield
Springfield’s Building Division Contractors Affidavit has the contractor certify that the building “has been built/altered under my supervision”, and it carries a line for the “Construction Supervisors License #:” entry, so the form carries the supervisor’s license number.
Sources: Boston’s Short-Form Permit page and Change of Licensed Builder page, Worcester’s Building & Zoning page, Cambridge’s building permits page, Lowell’s residential permit application, Somerville’s Building Division page and Springfield’s Contractors Affidavit.
A liability certificate for Boston and a declaration page for the DIA affidavit
Boston’s change-of-builder checklist asks for a “Certificate of Liability Insurance” and a “Workers’ Compensation Affidavit”. The certificate comes from a general liability policy, and the DIA affidavit asks an employer that insures its employees for “a copy of the workers’ compensation policy declaration page”, which comes from the workers’ compensation policy. For the rest of an insulation program, see the insulation business insurance page, commercial auto, tools and equipment, umbrella liability and the spray foam and fiberglass insulation contractor pages.
Through Wexford Insurance, LLC, an independent insurance agency, Insulation Contractor Insurance places coverage for insulation contractors. Premium depends on payroll, the materials you spray or blow, subcontracted work, vehicles and rigs, tool and equipment values, and the states you work in. We do not publish typical rates because there is no such thing as a typical insulation contractor. Your number of field employees, what you install, the state you are based in and the coverage you want to talk about are what the quote form asks.
Where a state sets rules on who may do the work or what it must meet, the policies still decide who pays when something goes wrong.
- Where a state sets a license, a registration or an energy code, it is a requirement of the state, not insurance.
A chart of what Massachusetts requires, in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. Contractor license: A state license or registration names insulation work; this page sets out the reach of each state rule. It leaves open injury and damage to others from the work, during the job and after it, which General Liability answers. Energy code: The International Energy Conservation Code, statewide, for residential and commercial buildings. It leaves open damage the finished work causes after you leave, which General Liability answers. Workers’ compensation: Required for covered employers, bought in the open market. It leaves open a crew member hurt on the job, which Workers’ Compensation answers. Notes: Where a state sets a license, a registration or an energy code, it is a requirement of the state, not insurance. The conclusion reads: Where a state sets rules on who may do the work or what it must meet, the policies still decide who pays when something goes wrong. No figures are shown.
Nearby states we also insure
Massachusetts coverage, services and state offices
What we insure
Coverage lines
State offices
- Office of Consumer Affairs and Business Regulation
- Board of Building Regulations and Standards
- Office of Public Safety and Inspections, Division of Occupational Licensure
- Department of Industrial Accidents
- Massachusetts Department of Energy Resources
- Division of Insurance
- Massachusetts Department of Labor Standards
- Occupational Safety and Health Administration
- U.S. Environmental Protection Agency
Massachusetts insulation contractor insurance questions
Massachusetts contractor license requirements: does the Construction Supervisor License have an insulation category?
The state’s Construction Supervisor License page lists a “Specialty CSL insulation” whose scope of work is “Installation of insulation including repair and replacement of sheathing and siding”. For that specialty it prints “Building Types and Structures: Buildings of any use containing less than 35,000 cubic feet 1- and 2-family dwellings with any additional accessory Buildings or structures for agricultural use”. The state building code says a licensed construction supervisor or licensed designee “shall be present on the site at some point to approve” listed work, among it “Energy conservation: Installation of insulation materials, vapor and air infiltration barriers.”
Massachusetts home improvement license: when does an insulation contractor need HIC registration?
M.G.L. c. 142A, § 9(a) says “No contractor or subcontractor shall undertake, offer to undertake, or agree to perform residential contracting services unless registered therefor with the approval of the office of consumer affairs and business regulation.” Section 1 defines residential contracting by work on “any pre-existing owner occupied building containing at least one but not more than four dwelling units”. The Office of Consumer Affairs and Business Regulation, in a chart it calls “for general guidance only”, marks insulation work yes for a CSL, an HIC registration and a building permit.
Is workers comp required in Massachusetts under chapter 152 when a crew has no set hours?
Under M.G.L. c. 152, § 25A, every employer must provide for compensation through an insurer or a self-insurance group or, subject to the department’s rules, a self-insurer license. The Department of Industrial Accidents says “All employers operating in Massachusetts are required to carry workers’ compensation insurance for their employees and themselves if they are an employee of their company. The requirement applies no matter the number of hours worked or the number of employees. The only exception is for domestic employees who must work at least 16 hours a week to be covered under a workers’ compensation policy.”
Massachusetts workers comp exemption: do owners, partners and LLC members have to cover themselves?
The Department of Industrial Accidents says “Members of a limited liability company (LLC), partners of a limited liability partnership (LLP), or sole proprietors of an unincorporated business aren’t required to carry workers’ compensation insurance for themselves”, and “This exemption does not apply to employees who are not members of the LLC or LLP. They must still be covered.” Under M.G.L. c. 152, § 1(4), the chapter is elective for an officer or director owning at least the stock share that subsection sets, only if that officer gives the commissioner “a written waiver of his rights under this chapter.”
Massachusetts energy code: which code applies to an insulation job in a given town?
The Department of Energy Resources says “The Base Code is IECC 2021 with MA amendments: 780 CMR Chapter 11R (residential) and 780 CMR Chapter 13 (commercial).” It also says “Municipalities may choose to adopt the Stretch Code in lieu of the Base Energy Code.” DOER describes the opt-in Stretch Code as IECC 2021 with key MA amendments and the opt-in Specialized Code as IECC 2021 key MA amendments. The Board of Building Regulations and Standards’ page tells readers to “consult your municipality to determine if one of these codes apply.”
Massachusetts insulation requirements: what does the state’s residential energy chapter say about installation?
The Massachusetts amendment to the residential air barrier and insulation installation table says “All insulation shall be installed at Grade I quality in accordance with ICC/RESNET 301.” and “Air-permeable insulation shall not be used as a sealing material.” Under Section R103.2, construction documents must show, as applicable, details that include “Insulation materials and their R-values.”
Spray foam insulation Massachusetts: which federal agency covers a private crew, and what does EPA publish?
OSHA’s Massachusetts State Plan page says “The Massachusetts State Plan covers all state and local government workers in the state” and “OSHA also exercises authority over private sector employers in the state and federal OSHA standards apply to these workers.” The U.S. Environmental Protection Agency’s spray polyurethane foam checklist says it “was prepared as a voluntary aid to protect against potential risks from SPF; it is not a regulatory compliance tool”, while “some of the best practices included in the checklist may be required under local, state or federal worker protection or other regulations.”
General liability insurance Massachusetts: which city permit pages ask for proof of insurance?
Boston’s Inspectional Services Department asks a Short-Form Permit applicant for a “Certificate of Liability Insurance (must be current)”, and Boston’s change-of-builder checklist asks for a “Certificate of Liability Insurance” and a “Workers’ Compensation Affidavit”. Somerville’s Building Division asks a licensed contractor for “your insurance, signed contract” along with the City’s affidavits. The Department of Industrial Accidents reminds employers: “Please be advised that workers’ compensation and liability insurance ARE NOT the same thing.”
This page describes insurance for insulation contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, workers’ compensation and energy-code requirements change; verify current requirements with the agency named before relying on them.
Get a quote for your Massachusetts insulation work
A Massachusetts insulation crew opens a quote by naming the state it is based in, what it installs, its number of field employees and the coverage it wants to talk about.